Combination boiler plantroom at Sainsbury's store

Combination boiler plantroom at Sainsbury's store

CAS designed and manufactured a prefabricated packaged plantroom for the new Sainsbury’s store in Hinckley. The final solution featured two gas-fired condensing boilers, each with an output of 210kW, and an 800-litre hot water heater. The finished plant room was 5.8m long x 3.3m wide x 3.0m high.
Constant Air Systems
  • PROJECT

Packaged plant - projects from other companies

Packaged plant - companies

This site uses cookies to enhance user experience.