Renewable On undertook the supply, installation and commissioning of solar PV on 3 sites for The Parks Trust, Milton Keynes.

Gavin Gager, Financial Director, The Parks Trust: “We had been looking to install solar PV on this site (Shenley Pavilions, office complex) but had been informed by installers that it was not possible due to the complexity of the layout. Step up Renewable On who immediately recognised the potential the site offered and designed, supplied installed and commissioned the installation.

As Financial Director returns and yield are fundamental to our business. William calculated and reviewed with me the important financial facts. We are delighted with the increase in yield to the property and in turn the increase in the value of the asset.

We have since used Renewable On to install additional PV arrays to our portfolio with more in the pipeline,”

Installation Dynamics:

Full turn key installation
Complicated multi roof complex
Installed on the South West and South East facing roof spaces
Large scale scaffolding
Two 4m x 8m loading bays 12 m high
Working platform
Crane lift to loading bays
Liaison with DNO including application and approval for connection
Structural Engineer
Installation of Export meter
FiT registration
Ofgem Renewables and CHP Registration

Alex Mason, Senior Surveyor, Rapleys’ Corporate Real Estate: “I’ve had a number of comments from occupiers praising the professionalism of the workmen and having inspected the works myself I can confirm that tidiness and quality of fitting is the best I have seen.”

Site summaries:

1. Shenley Pavilions, office complex

System size:
100kWp
400 solar panels
8 inverters

Generates:
88,900kWh

CO2 Emissions Reduction:
48 tonnes

Annual saving in Yr 1:
Over £16,570

Estimated lifetime income:
Over £464,000

Performance:
Currently performing 12% above estimated generation levels

2. Kiln Farm – Milton Keynes
49kWp
196 Solar Panels
Revenue in Year 1: Over £7,333
Estimated lifetime income: Over £187,465

3. Caldecotte Sailing Club – Milton Keynes
25kWp
100 Solar Panels
Revenue in Year 1: Over £3,400
Estimated lifetime income: Over £89,000


Renewable On undertook the supply, installation and commissioning of solar PV on 3 sites for The Parks Trust, Milton Keynes.

Gavin Gager, Financial Director, The Parks Trust: “We had been looking to install solar PV on this site (Shenley Pavilions, office complex) but had been informed by installers that it was not possible due to the complexity of the layout. Step up Renewable On who immediately recognised the potential the site offered and designed, supplied installed and commissioned the installation.

As Financial Director returns and yield are fundamental to our business. William calculated and reviewed with me the important financial facts. We are delighted with the increase in yield to the property and in turn the increase in the value of the asset.

We have since used Renewable On to install additional PV arrays to our portfolio with more in the pipeline,”

Installation Dynamics:

Full turn key installation
Complicated multi roof complex
Installed on the South West and South East facing roof spaces
Large scale scaffolding
Two 4m x 8m loading bays 12 m high
Working platform
Crane lift to loading bays
Liaison with DNO including application and approval for connection
Structural Engineer
Installation of Export meter
FiT registration
Ofgem Renewables and CHP Registration

Alex Mason, Senior Surveyor, Rapleys’ Corporate Real Estate: “I’ve had a number of comments from occupiers praising the professionalism of the workmen and having inspected the works myself I can confirm that tidiness and quality of fitting is the best I have seen.”

Site summaries:

1. Shenley Pavilions, office complex

System size:
100kWp
400 solar panels
8 inverters

Generates:
88,900kWh

CO2 Emissions Reduction:
48 tonnes

Annual saving in Yr 1:
Over £16,570

Estimated lifetime income:
Over £464,000

Performance:
Currently performing 12% above estimated generation levels

2. Kiln Farm – Milton Keynes
49kWp
196 Solar Panels
Revenue in Year 1: Over £7,333
Estimated lifetime income: Over £187,465

3. Caldecotte Sailing Club – Milton Keynes
25kWp
100 Solar Panels
Revenue in Year 1: Over £3,400
Estimated lifetime income: Over £89,000