Sector Sport
Project type Refurbishment
Services provided Product / system manufacture
Product / system supply
Client Worcester Warriors
Contractor Peak Air Conditioning
Products used Nor-Ray-Vac sradiant heating system
 
 

Context

The indoor training facilities of the Worcester Warriors have undergone a major refurbishment, ensuring players have a first class base during the week and on match days.

“The redevelopment has given us a rugby facility which is amongst the best in English club rugby, something which will enable current and future players and back room staff to perform in a top-class working environment” said chief executive Jim O’Toole. “This continues to be a very exciting time for everyone involved with Worcester Warriors as we look to take this club forward both on and off the pitch.”

Product supplied

The Nor-Ray-Vac systems were ideal for the redevelopment project of the indoor training centre as one of the major benefits to radiant heat is to be able to create an environment without stuffiness, in which occupants can exercise vigorously in complete comfort. The Nor-Ray-Vac system was designed and implemented by contractors Peak Air Conditioning based in Cheshire, and provides blanket heat coverage of the training facility, eliminating any cold spots and has an estimated potential fuel saving of 36% over an equivalent warm air system.

The total system installed comprised 16 x 24LR burners suspended at 4.3m and 5.6m following the roof pitch, complete with ball guards and are arranged in two temperature zones controlled by Reznor SmartCom3 with just two discharge flue points.

Outcome

The Nor-Ray-Vac heating provides

  • Uniform blanket heat coverage minimising any effect of cold spots
  • Highly efficient with rapid heat recovery times
  • Zoning capabilities produces considerable fuel economies and cost reductions
  • Comfortable environmental temperature with approx. 5oC lower air temperature
  • Potential savings of 36% over an equivalent warm air system


Context

The indoor training facilities of the Worcester Warriors have undergone a major refurbishment, ensuring players have a first class base during the week and on match days.

“The redevelopment has given us a rugby facility which is amongst the best in English club rugby, something which will enable current and future players and back room staff to perform in a top-class working environment” said chief executive Jim O’Toole. “This continues to be a very exciting time for everyone involved with Worcester Warriors as we look to take this club forward both on and off the pitch.”

Product supplied

The Nor-Ray-Vac systems were ideal for the redevelopment project of the indoor training centre as one of the major benefits to radiant heat is to be able to create an environment without stuffiness, in which occupants can exercise vigorously in complete comfort. The Nor-Ray-Vac system was designed and implemented by contractors Peak Air Conditioning based in Cheshire, and provides blanket heat coverage of the training facility, eliminating any cold spots and has an estimated potential fuel saving of 36% over an equivalent warm air system.

The total system installed comprised 16 x 24LR burners suspended at 4.3m and 5.6m following the roof pitch, complete with ball guards and are arranged in two temperature zones controlled by Reznor SmartCom3 with just two discharge flue points.

Outcome

The Nor-Ray-Vac heating provides

  • Uniform blanket heat coverage minimising any effect of cold spots
  • Highly efficient with rapid heat recovery times
  • Zoning capabilities produces considerable fuel economies and cost reductions
  • Comfortable environmental temperature with approx. 5oC lower air temperature
  • Potential savings of 36% over an equivalent warm air system


Interested in this project?
Call 01384 489700
OR
 
 
 
Enquire
 


Related entries

  • Reznor: Reznor Nor-Ray-Vac radiant tube heating
    Reznor Nor-Ray-Vac radiant tube heating
    Reznor
    Nor-Ray-Vac is a gas fired continuous radiant tube heating system, designed specially for the building it is required to heat. It provides uniform heat coverage over the entire floor area. Alternatively, the system can also...