CAS designed and manufactured two prefabricated packaged plantrooms for the new Marks and Spencer’s store in Longbridge.

The first plantroom was a boiler plantroom which featured the following services:

  • A modulating gas-fired boiler with an output of 380kW.
  • A single-head LTHW circulating pump.
  • A vacuum de-gassing unit complete with a 450-litre expansion vessel.
  • Controls, lighting/emergency lighting and small power.
  • Internal drainage.

The finished plant room was 6.0m long x 4.0m wide x 3.0m high.

 

The second plantroom was a cold water plantroom which featured the following services:

  • A 300-litre gas fired water heater complete with an unvented kit comprising of combined reducing valve/strainer, check valve, expansion valve, expansion vessel, temperature/pressure relief valve and tundish.
  • A single-head HWS return circulating pump.
  • A twin-head cold water booster set.
  • A 10,000-litre single-piece cold water storage tank.
  • Controls, lighting/emergency lighting and small power.
  • Internal drainage.


The finished plant room was 6.0m long x 4.0m wide x 3.0m high.


CAS designed and manufactured two prefabricated packaged plantrooms for the new Marks and Spencer’s store in Longbridge.

The first plantroom was a boiler plantroom which featured the following services:

  • A modulating gas-fired boiler with an output of 380kW.
  • A single-head LTHW circulating pump.
  • A vacuum de-gassing unit complete with a 450-litre expansion vessel.
  • Controls, lighting/emergency lighting and small power.
  • Internal drainage.

The finished plant room was 6.0m long x 4.0m wide x 3.0m high.

 

The second plantroom was a cold water plantroom which featured the following services:

  • A 300-litre gas fired water heater complete with an unvented kit comprising of combined reducing valve/strainer, check valve, expansion valve, expansion vessel, temperature/pressure relief valve and tundish.
  • A single-head HWS return circulating pump.
  • A twin-head cold water booster set.
  • A 10,000-litre single-piece cold water storage tank.
  • Controls, lighting/emergency lighting and small power.
  • Internal drainage.


The finished plant room was 6.0m long x 4.0m wide x 3.0m high.


Interested in this project?
Call 01494 469529
OR
 
 
 
Downloads
  • Case Study - M&S, Longbridge
    Case Study - M&S, Longbridge
    2pp 279.08KB
    Download
 
 
 
Enquire
 


Related entries

  • Constant Air Systems: LTHW boiler plantrooms
    LTHW boiler plantrooms
    Constant Air Systems
    The LTHW boiler plantrooms are designed and manufactured to client specification at CAS House in High Wycombe then delivered to site. They can be used for almost any building application, especially when when on-site...

Also by Constant Air Systems

Constant Air Systems address and contact details

Constant Air Systems Ltd
CAS House
Unit L, Turnpike Way
Cressex Business Park
High Wycombe
HP12 3TF
Tel: 01494 469529
Fax: 01494 469549
View on map
 
Follow Constant Air Systems
 
Not found what you're looking for? View other options

Ask Constant Air Systems about

Packaged boiler and cold water plantrooms at M&S store