Sector Industrial
Project type Refurbishment
Services provided Product / system manufacture
Product / system supply
Year completed 2013
Project location North West England
Client AstraZeneca
Products used High precision air handling unit with integrated controls
 
 

AstraZeneca is the UK’s second-largest pharmaceutical company. In Macclesfield, AstraZeneca has opened a pharmaceutical development laboratory building to support the development of new medicines.

AstraZeneca required a cooling solution that would be adept at dealing with their critical laboratory environment; where precise temperature, humidity and air quality control is required.

Barkell delivered a high-precision air handling unit with integrated controls. The air handling system was configured to suit AstraZeneca's operational needs where performance, reliability and precision are essential; ensuring that equipment remained in optimum working condition and that research and development was not compromised.


AstraZeneca is the UK’s second-largest pharmaceutical company. In Macclesfield, AstraZeneca has opened a pharmaceutical development laboratory building to support the development of new medicines.

AstraZeneca required a cooling solution that would be adept at dealing with their critical laboratory environment; where precise temperature, humidity and air quality control is required.

Barkell delivered a high-precision air handling unit with integrated controls. The air handling system was configured to suit AstraZeneca's operational needs where performance, reliability and precision are essential; ensuring that equipment remained in optimum working condition and that research and development was not compromised.


Air handling units - all companies