Sector Commercial
Project type New build
Services provided Design
Product / system supply
Installation
Project location London
 
 

Constant Air Systems built two new chilled water prefabricated plantrooms for new office buildings for Bloomberg L.P. in London.

Each plantroom features the following services:

  • Three single-head chilled water circulating pumps
  • A pressurisation degassing unit
  • A packaged side stream filtration unit
  • Controls, lighting/emergency lighting and small power
  • Internal drainage

The finished plantrooms measured 5.5m x 3.0m x 3.0m high.


Constant Air Systems built two new chilled water prefabricated plantrooms for new office buildings for Bloomberg L.P. in London.

Each plantroom features the following services:

  • Three single-head chilled water circulating pumps
  • A pressurisation degassing unit
  • A packaged side stream filtration unit
  • Controls, lighting/emergency lighting and small power
  • Internal drainage

The finished plantrooms measured 5.5m x 3.0m x 3.0m high.


Interested in this project?
Call 01494 469529
OR
 
 
 
Downloads
  • Case Study - Bloomberg LP
    Case Study - Bloomberg LP
    2pp 254.52KB
    Download
 
 
 
Enquire
 


Also by Constant Air Systems

Constant Air Systems address and contact details

Constant Air Systems Ltd
CAS House
Unit L, Turnpike Way
Cressex Business Park
High Wycombe
HP12 3TF
Tel: 01494 469529
Fax: 01494 469549
View on map
 
Follow Constant Air Systems
 
Not found what you're looking for? View other options

Ask Constant Air Systems about

Bespoke prefabricated packaged chilled water plantroom