Projects and case studies featuring waste on BUILDING SERVICES. Inspiration and ideas to help you find the best solution for your project.
1-15 of 23
  • BLUCHER UK: Pipework for redevelopment of London Bridge station
    Pipework for redevelopment of London Bridge station
    BLUCHER UK
    A £500m redevelopment project at London Bridge railway station is part of the £6bn Thameslink Programme, the objective being to increase passenger and rail capacity. BLÜCHER® EuroPipe was specified for its strength,...
  • BLUCHER UK: Pipework and drainage for the Leadenhall Building
    Pipework and drainage for the Leadenhall Building
    BLUCHER UK
    Designed by architects RSH+P and constructed by Laing O'Rourke, the 224m-tall Leadenhall Building is already recognised as a great piece of contextual architecture. BLÜCHER® EuroPipe was specified by ARUP and installed by...
  • BLUCHER UK: Custom drainage channels for Adare Manor & Golf Resort
    Custom drainage channels for Adare Manor & Golf Resort
    BLUCHER UK
    After an 18-month closure for refurbishment and the building of an extension, the 5-star Adare Manor & Golf Resort reopened its doors in November 2017. Working closely with the main contractor JP Construction, BLÜCHER...
  • BLUCHER UK: Stainless steel drainage solution for airport car park
    Stainless steel drainage solution for airport car park
    BLUCHER UK
    BLÜCHER's EuroPipe system was installed in a new multi-storey car park at Terminal Two, Manchester Airport. The new car park has space for 3,800 vehicles and is part of a £1 billion transformation programme at the airport.
  • BLUCHER UK: EuroPipe and floor drains for HMP Berwyn super-prison
    EuroPipe and floor drains for HMP Berwyn super-prison
    BLUCHER UK
    BLÜCHER worked closely with Crown House Technology for pipes and drainage solutions at the new £212m super-prison constructed in Wrexham North Wales. HMP Berwyn, the new men's category C facility, will house 2100 inmates.
  • BLUCHER UK: Customised drainage for office transformed into hotel
    Customised drainage for office transformed into hotel
    BLUCHER UK
    BLÜCHER worked on a custom drainage solution for The Park Regis Hotel at Five Ways Birmingham. Linear drainage channels were designed for the fire-fighting lift, to prevent water from entering lift wells
  • BLUCHER UK: Stainless steel pipework for Leicester Royal Infirmary
    Stainless steel pipework for Leicester Royal Infirmary
    BLUCHER UK
    University Hospitals of Leicester wanted to save money and lower their carbon footprint when undertaking renovation work to cope with 21st century demands. BLÜCHER® EuroPipe was specified to bypass existing traditional cast...
  • BLUCHER UK: 3090m stainless steel drainage pipe, Gateway New Street
    3090m stainless steel drainage pipe, Gateway New Street
    BLUCHER UK
    3090 metres of BLÜCHER's EuroPipe hygienic stainless steel drainage pipework system were specified for the new Gateway New Street railway station in Birmingham. Stainless steel was used throughout the building, including for...
  • Component Developments: Internal drainage channel for Anspach & Hobday Brewery
    Internal drainage channel for Anspach & Hobday Brewery
    Component Developments
    Component Developments worked alongside Flordeck to design, manufacture and supply a stainless steel drainage channel for Anspach & Hobday Brewery. The channel included permanent brace bars, anchors, levelling feet and a...
  • Component Developments: Drainage and Impact Protection for Café Royal Hotel
    Drainage and Impact Protection for Café Royal Hotel
    Component Developments
    The Cafe Royal on Regent Street in London, originally opened in 1865 by French wine merchant Daniel Nicholas Thévenon, underwent major refurbishment works, overseen by David Chipperfield Architects, to restore its historic...
  • Geberit: Drainage and waste system for Westfield Shopping Centre
    Drainage and waste system for Westfield Shopping Centre
    Geberit
    Geberit provided products for the construction of the Westfield London Shopping Centre in White City. The £1.7bn project called for a highly efficient drainage system, waste pipes and WC controls
  • Component Developments: Bespoke stainless steel channel drains for Tate Modern
    Bespoke stainless steel channel drains for Tate Modern
    Component Developments
    Tate Modern is London’s free National Museum of Modern and Contemporary Art with 5.8 million visitors in 2016. Component Developments was approached to design, manufacture and supply stainless steel drainage for the...
  • Component Developments: Component Developments work with 2 Sisters Food Group
    Component Developments work with 2 Sisters Food Group
    Component Developments
    Component Developments designed and supplied a long T shape drainage channel system for a wash down facility in an area constantly trafficked by pallet trucks.
  • Component Developments: Stainless Drainage Channels for Facebook, London
    Stainless Drainage Channels for Facebook, London
    Component Developments
    Component Developments was specified for various stainless steel drainage, access and surface protection products within the Facebook office at Brock Street in London
  • Component Developments: Floor drainage and gullies for Za Za Bazaar restaurant
    Floor drainage and gullies for Za Za Bazaar restaurant
    Component Developments
    Za Za Bazaar is a banquet-style global cuisine restaurant based in Newcastle. This project was fast-tracked to achieve a handover prior to the Christmas period. Component Developments designed and manufactured stainless...