Projects and case studies featuring cooling on BUILDING SERVICES. Inspiration and ideas to help you find the best solution for your project.
1-12 of 12
  • TROX UK: Air management solutions for Tech and Innovation Centre
    Air management solutions for Tech and Innovation Centre
    TROX UK
    Project, 24 June 2019
    Project
    SAVE Project
  • TROX UK: Efficient chilled beams for BREEAM learning environment
    Efficient chilled beams for BREEAM learning environment
    TROX UK
    Project, 07 October 2020
    Project
    SAVE Project
  • TROX UK: Efficient chilled beams for BREEAM office environment
    Efficient chilled beams for BREEAM office environment
    TROX UK
    Project, 24 June 2019
    Project
    SAVE Project
  • TROX UK:  Air handling products for sustainable offices
    Air handling products for sustainable offices
    TROX UK
    Project, 24 June 2019
    Project
    SAVE Project
  • Armstrong Fluid Technology: Integrated HVAC solutions, data centre, Digital Realty
    Integrated HVAC solutions, data centre, Digital Realty
    Armstrong Fluid Technology
    Project, 16 January 2014
    Project
    SAVE Project
  • TROX UK: Air management solutions for Tech and Innovation Centre
    Air management solutions for Tech and Innovation Centre
    TROX UK
    TROX UK provided a range of air management solutions for the £89m Technology and Innovation Centre (TIC) at the University of Strathclyde, a state-of-the-art facility covering 25,000 sqm of space. Products included multi-service...
    SAVE Project
  • TROX UK: Efficient chilled beams for BREEAM learning environment
    Efficient chilled beams for BREEAM learning environment
    TROX UK
    TROX UK designed and manufactured Multi Service Chilled Beams (MSCBs) based around a standard passive chilled beam for use in the £23m Elmer Square development. MSCBs were installed in the library, teaching and meeting room...
    SAVE Project
  • TROX UK: Efficient chilled beams for BREEAM office environment
    Efficient chilled beams for BREEAM office environment
    TROX UK
    TROX UK designed and manufactured top discharge beams and Multi Service Chilled Beams for Bernard Weatherill House in Croydon. The 13 storey commercial building (awarded BREEAM "Excellent") is designed to house Croydon Council...
    SAVE Project
  • TROX UK:  Air handling products for sustainable offices
    Air handling products for sustainable offices
    TROX UK
    TROX UK supplied a range of air handling products for the UBS headquarters in London. The new building houses up to 6,000 people and features four immense trading floors in 700,000sq ft of Grade "A" office space and has been...
    SAVE Project
  • Armstrong Fluid Technology: Integrated HVAC solutions, data centre, Digital Realty
    Integrated HVAC solutions, data centre, Digital Realty
    Armstrong Fluid Technology
    Digital Realty has built data centre facilities worldwide for companies ranging in size from small firms to Fortune 500 corporations. It offers complete data centre solutions, not only guaranteeing price and delivery date, but...
    SAVE Project
  • Chilled beams for optimum college learning environment
    TROX UK
    TROX UK provided multi service chilled beams for the £22M Newcastle Sixth Form College project, to create the optimum indoor environment for learning in the building. The MSCBs are based on the energy-efficient air-water...
    SAVE Project
  • Energy efficient cooling solution, Custodian Data Centre
    Airedale International Air Conditioning
    Working in direct partnership with Custodian Data Centre, Airedale designed and built an intelligent, energy efficient data centre cooling solution that significantly reduces the need for mechanical cooling.
    SAVE Project
  • Chillers for comfort cooling at historic Tower of London
    Airedale International Air Conditioning
    Cooling specialist, Airedale International, specially reduced the size of its chillers to fit into openings at the historic Tower of London, as part of a major refurbishment programme
    SAVE Project
  • London chiller logistics
    Airedale International Air Conditioning
    Airedale International’s design engineers, service and controls experts formed part of a multi-disciplinary team managing a complex chiller design, manufacture and installation project involving two 40-minute helicopter lift...
    SAVE Project
  • Norman Foster's Commerzbank HQ: radiant cooled ceilings
    Barcol-Air
    Opened in 1997, the multi-storey Commerzbank provides a workplace for over 2,500 people. The Commerzbank building is a symbol of innovation and an excellent example of making maximum use of natural light. The impressive building...
    SAVE Project
  • Airedale low GWP chiller keeps John Lewis store cool
    Airedale International Air Conditioning
    The first ever UK manufactured chiller incorporating the low global warming potential (GWP) refrigerant R1234ze to hold BSI approval is currently cooling shoppers visiting the new £15 million John Lewis shop which opened in York...
    SAVE Project
  • Treated water distribution system for data centre
    Airedale International Air Conditioning
    One of the biggest downtime threats for data centre operators is leaks, and preventing them is one of the most fundamental areas of protection of data centres and critical facilities. Airedale developed a bespoke T4TWDS (The Tier...
    SAVE Project