Projects and case studies featuring heating & cooling on BUILDING SERVICES. Inspiration and ideas to help you find the best solution for your project.
91-105 of 105
  • ProCon HTP gas condensing boilers, Victoria Station
    MHG Heating
    MHG Heating recently supplied two ProCon HTP 225kW floor-standing gas condensing boilers with integral plate heat exchangers and flexible flues to Network Rail's Kent Side offices at London Victoria Station. The boilers serve a...
    SAVE Project
  • Portcullis House: energy-saving underfloor heating
    Warmafloor
    Portcullis House, the Parliamentary building opposite the Palace of Westminster, was specifically designed to be energy saving and environmentally-friendly; using, it is claimed, just 25% of the energy that would be required for...
    SAVE Project
  • Gas-fired condensing boilers, St James Palace
    MHG Heating
    MHG Heating Ltd ProCon 47 and ProCon 75 wall-mounted, gas-fired condensing boilers have been applied to two systems within the St James Palace complex as part of a program to reduce the carbon footprint of the palace. The units...
    SAVE Project
  • Underfloor heating - Olympic Glasshouse Gardens
    Warmafloor
    Olympic Glasshouse Gardens provides 333 residential apartments across a 30-storey and 17-storey building. Set in landscaped gardens, the luxury blocks overlook iconic Olympic legacy landmarks. Warmafloor’s UFH system was selected...
    SAVE Project
  • Steam boiler system for Tewin Bury Farm Hotel laundry
    Fulton
    A Fulton J Series oil-fired steam boiler was specified for Tewin Bury Farm Hotel, so that the venue could operate its own on-site laundry, including a dry cleaning section and larger steam laundry driers, washers and ironers
    SAVE Project
  • Structural cooling, Imperial War Museum, Trafford
    Warmafloor
    Opened in 2002, the Imperial War Museum North brings together a remarkable collection of film, photographs, art, books, documents, sound recordings and exhibits. It is stimulating, accessible and has wide appeal. The new Museum...
    SAVE Project
  • Athletes' Village: acoustic floor w. underfloor heating
    Warmafloor
    Warmafloor has extensive experience in helping large and complex inner city regeneration projects achieve their energy efficiency and sustainability targets. Warmafloor worked in partnership with LendLease on various projects for...
    SAVE Project
  • Boiler and water heater replacement, NHS Surrey PCT
    Hamworthy Heating
    With the aim of reducing carbon emissions and improving efficiencies, NHS Surrey embarked on an upgrade programme to their heating and hot water systems across more than twenty sites. As many of the boilers and water heaters were...
    SAVE Project
  • Renewable energy reduces bills for hotel and golf club
    Hamworthy Heating
    The Bells Hotel and Golf Club, located in the heart of the Forest of Dean, had a 30 year old cast iron gas boiler that was beyond repair. The owners of the complex decided it was an ideal time to look for an alternative energy...
    SAVE Project
  • London chiller logistics
    Airedale International Air Conditioning
    Airedale International’s design engineers, service and controls experts formed part of a multi-disciplinary team managing a complex chiller design, manufacture and installation project involving two 40-minute helicopter lift...
    SAVE Project
  • Norman Foster's Commerzbank HQ: radiant cooled ceilings
    Barcol-Air
    Opened in 1997, the multi-storey Commerzbank provides a workplace for over 2,500 people. The Commerzbank building is a symbol of innovation and an excellent example of making maximum use of natural light. The impressive building...
    SAVE Project
  • Airedale low GWP chiller keeps John Lewis store cool
    Airedale International Air Conditioning
    The first ever UK manufactured chiller incorporating the low global warming potential (GWP) refrigerant R1234ze to hold BSI approval is currently cooling shoppers visiting the new £15 million John Lewis shop which opened in York...
    SAVE Project
  • Warmafloor underfloor heating at the Airbus factory
    Warmafloor
    Warmafloor surface heating provided a significantly more cost effective solution than the more traditional heating systems for the Airbus A380 wings assembly lines.
    SAVE Project
  • Treated water distribution system for data centre
    Airedale International Air Conditioning
    One of the biggest downtime threats for data centre operators is leaks, and preventing them is one of the most fundamental areas of protection of data centres and critical facilities. Airedale developed a bespoke T4TWDS (The Tier...
    SAVE Project
  • Duo of green technologies benefit school in Norfolk
    Hamworthy Heating
    Fairstead Community School in Kings Lynn, Norfolk had been operating its heating and hot water systems through a mix of mains gas and oil. With the equipment coming to the end of its expected life, Norfolk County Council saw this...
    SAVE Project